HAPTER 5: CABLING THE SYSTEM
6. To connect the second (B) power source, do the following:
Connect the return wire from the second power source to the power
terminal labelled 48 V (B) Return, as shown in Figure 5-14.
and
Connect the Source wire from the second power source to the power
terminal labelled –48 V (B) Feed, as shown in Figure 5-14.
Figure 5-14 Wiring the Power
7. Cover the power connectors with the Power Connector Cover, ensuring
that the wiring is properly placed through the opening at the bottom of
the cover. Then place the wires through the resistance clasp on the cover,
as shown in Figure 5-15.
BAC_32B
Power
Studs (4)
48 V (A) Return
-48 V (A) Feed
48 V (B) Return
-48 V (B) Feed
Power
Connector
Captive
Cover Screw
Captive
Thumbscrew
Nuts (4)
Lock Washers (4)
Lug Rings